Installation Timeline
What Happens on Each Day of a Ducted Install?
Every home is different, but a typical single-storey installation follows this pattern:
| Stage | What we do | What you will notice |
|---|---|---|
| Before day one | Final measure, roof check and equipment delivery | A short site visit and boxes in the garage or carport |
| Day 1 | Indoor unit lifted into the roof, outdoor unit placed, main trunk ducts laid out | Most activity in the roof and around the manhole |
| Day 2 | Ceiling outlets and return air grille cut in, flexible ducts connected, pipework and drain run | Ceiling cuts in each room, drop sheets down, some noise |
| Day 3 | Electrical connection, pressure test, commissioning, zone and controller setup | System running and a walkthrough of the controls |
Double-storey homes, very large systems or difficult roof access can add a day. Every stage is part of our ducted air conditioning installation service, so one team handles the job from start to finish and you always know who to call.


Before We Arrive
Getting Your Home Ready for a Ducted Install
A little preparation makes installing ducted air conditioning faster and cleaner. In the week before your install:
- Clear the manhole area – empty the cupboard or hallway under the roof access and move anything stored in the roof nearby.
- Move furniture from outlet spots – we mark outlet positions at the measure, and shifting beds, couches and cabinets saves time on the day.
- Plan for short power outages – the power goes off while the electrician connects the system, usually for under an hour in total.
- Leave a clear path outside – the outdoor unit and ducting come in on a trolley, so a free driveway and side path help.
- Tell us what is in the roof – solar cabling, old insulation, past termite work or known asbestos in older homes all affect how we work.
If anyone at home works night shifts or has a newborn, let us know and we will schedule the noisier roof work around them.
Included In Every Install
What Installing Ducted Air Conditioning With Us Includes
Whatever the size of your home, every installation includes:
- Pre-install measure and roof inspection – confirming duct runs, outlet positions, unit location and roof access before day one.
- Correctly sized system and ductwork – capacity matched to your floor area, insulation and orientation, with insulated ducts sized for each room.
- Neat outlets and return air grille – cut, sealed and positioned for even airflow and quiet running.
- Licensed electrical and refrigeration work – a dedicated circuit, isolator, pressure test and evacuation to Australian standards.
- Daily protection and clean-up – drop sheets, shoe covers and a vacuum at the end of every day, not just the last one.
- Handover and paperwork – controller and zone setup, a filter-cleaning demo, warranty registration and compliance certificates.


Perth Pricing Guide
How Much Does Installing Ducted Air Conditioning Cost?
Installing ducted air conditioning in a Perth home typically costs $9,000–$20,000+, with most 3–4 bedroom homes between $11,000 and $16,000. Zoning usually adds about $1,000–$3,000. The main things that move the price are:
| Price driver | Why it matters |
|---|---|
| System capacity | Larger homes and west-facing living areas need a bigger unit and more ducting |
| Outlets and zones | Each outlet adds duct, labour and a ceiling cut; each zone adds a damper and control |
| Roof access | Low, tight or hot roof spaces take longer to work in |
| Single or double-storey | Upper floors may need a second system or extra duct runs |
| Electrical upgrades | Older switchboards may need work before the system can be connected |
Our Process
From Measure-Up to Handover in Four Steps
Here is how a ducted installation runs with Greenarmy Services, from first visit to first cool night:
- Free in-home measure – we inspect the roof space, measure each room and talk through how your household uses them.
- Itemised quote and install date – you get a fixed scope, a timeline and a preparation checklist for the week before.
- Two to three days of installation – roof work, outlets, pipework and electrical, with a clean-up every afternoon.
- Commissioning and handover – we test every zone, set up the controller and show you how to clean the return air filter.


During The Install
Living at Home While Your Ducted System Goes In
Most families stay home while we are installing ducted air conditioning, and that usually works well. A few practical points help:
Noise and dust – the loudest work is cutting outlets and fixing the outdoor unit. Each ceiling cut is vacuumed straight away and drop sheets stay down until we finish the room.
Working from home – each room is only out of action for a few hours. We tell you the order each morning so you can move your desk or laptop.
Pets and children – doors and gates are open more than usual while ducting comes in, so keep pets secured and little ones away from ladders.
Summer installs – a Perth roof space on a hot day can be dangerously hot, so we start early and may pause roof work in the afternoon. Booking in spring or autumn often means quicker scheduling.
Once the job is handed over, your system needs very little from you beyond cleaning the return air filter every few months.
Related Ducted Guides
Planning Your Ducted Project
Still weighing things up? These pages answer the other questions homeowners ask before installing ducted air conditioning, and our local pages cover nearby suburbs:
- Retrofitting ducted into an existing home
- Choosing a ducted installer
- Ducted installation prices in Perth
- Air conditioning servicing
- Joondalup
- Ellenbrook
- Baldivis
- South Perth
For an overview of systems and options, visit our main ducted air conditioning installation page.

Frequently Asked Questions About Installing Ducted Air Conditioning
Your Installation Day Questions Answered
Installing ducted air conditioning in a typical single-storey Perth home takes two to three days. Double-storey homes, large systems or difficult roof access can add a day, and we confirm the timeline in your quote.
Someone needs to let us in on the first morning and be there for the handover on the last day. In between you can come and go, as long as we have access to the house, the roof manhole and the switchboard.
Most dust comes from cutting the ceiling outlets. We lay drop sheets, vacuum each cut straight away and clean up at the end of every day, so the house is liveable each evening.
Usually less than an hour in total, on the final day while the electrician connects the dedicated circuit. We always let you know before switching it off.
Clear the space under the manhole, anything stored in the roof near it and furniture under the marked outlet positions. A clear path to the outdoor unit location also helps.
Yes. Perth roof spaces get extremely hot in summer, so we start early and do roof work in the cooler part of the day. Spring and autumn bookings are often easier to schedule.
We run every zone, show you the controller and timers, explain how to clean the return air filter and give you the warranty and compliance paperwork.
Clean the return air filter every few months and book a professional service every one to two years to keep the system efficient and support your warranty.
